History

Wimbledon

The first section of what is now known as the District line, started operation on 24th December 1868 between South Kensington and Westminster.

The District was the second company to operate underground railway services in London, and like its predecessor, the Metropolitan, its history is inextricably linked with that of the Circle.

The District was extended in stages beyond Westminster and the final link of the present day Circle line was completed in 1884. This link included an extension via Aldgate East to Whitechapel.

In 1869 the District started operating a line between Gloucester Road and West Brompton and the following year installed its own pair of tracks between Gloucester Road and South Kensington parallel to those of the Metropolitan Railway.

The District also put in connections from Earl's Court to both High Street Kensington and Kensington Olympia. The railway reached Hammersmith in 1874, Richmond in 1877 and Ealing Broadway two years later.

The railway reached Hammersmith in 1874, Richmond in 1877 and Ealing Broadway two years later

In 1883 a short-lived extension was introduced to Windsor from Ealing Broadway over the tracks of the Great Western Railway. This service was withdrawn in 1885.

From West Brompton the service was extended to Putney Bridge in 1880 and to Wimbledon in 1889. In 1902 the Whitechapel & Bow Railway - with trains provided by the District - opened, allowing through operation to Upminster.

Further District extensions to Hounslow (1884) and Uxbridge (1910) were transferred to the Piccadilly line in 1964 and 1933 respectively. The District has always been closely associated with the operation of other railways, and in its time has run services not just to Windsor but also to Southend.

When Railtrack was set up in 1994, the District Line took over all the infrastructure of the line from Putney Bridge to Wimbledon including East Putney, Southfields and Wimbledon Park stations.

The Richmond branch of the line continues to be a joint operation with Silverlink Train Services over tracks between Gunnersbury and Richmond for which Railtrack is now responsible.

District line facts

Number of passengers on the District line

Weekday Saturday Sunday Annual (mil)
556,252 353,750 233,089 172.879
*It is accurate to say that 3 million people travel on the Tube every week day. However, if the weekday totals for each line added up they will give a figure of 4 million. This is because many passengers will use more than one line to complete a journey.

The District line covers 64 km (40 miles) and serves 60 stations, 42 of which are managed by the District line team. 66 trains are required to operate the full morning and evening peak period services on the main section of the line, with an additional ten operating the Edgware Road branch.

The District line covers 64 km (40 miles) and serves 60 stations, 42 of which are managed by the District line team

Two types of train operate District line services. The main service uses D stock trains, which entered service between 1979 and 1983, and are maintained at the line's two depots at Ealing Common and Upminster.

Ealing Common also overhauls the trains and accommodates part of the fleet of engineers' vehicles needed for essential maintenance work throughout the Underground system. The Edgware Road and Olympia branches are served by C stock trains, (which also run on the Circle and Hammersmith & City lines), purchased in two batches in 1969 and 1977.

Fulham Broadway

The C stock is maintained at the Metropolitan and Circle lines' Hammersmith depot. The District is one of the most complex of all the Underground lines to operate, with a single route eastwards to Upminster but to the west three branches to Ealing, Richmond and Wimbledon. The main central London tracks also accommodate the southern section of the Circle line. Additionally, there is a separate Wimbledon / Putney Bridge service to Edgware Road and a branch to Olympia.

All services pass through Earl's Court, which is the operational hub of the line and the location of the control centre, from where the Piccadilly line is also controlled.

The District line's stations reflect its long and varied history with a wide range of architectural styles, and include some such as Barons Court and Fulham Broadway which have been listed as buildings of especial interest.

Southfields

Contrasting with the District Railway's early overall-roofed stations at West Brompton and Fulham Broadway are the ex-London, Tilbury and Southend Railway stations at Plaistow and East Ham with their ornately monogrammed canopy ironwork.

Ex-London and South Western Railway cottage-style stations at Wimbledon Park and Southfields are similarly distinctive as is the classic 1930s Charles Holden station at Chiswick Park (also listed). Hammersmith Station's platforms and circulating areas have recently been completely updated in contemporary style.

District line management

London Underground has recently established a Public Private Partnership (PPP) to secure stable, long term investment in the system.

This follows the Government's announcement in March 1998 of its intention to divide London Underground into a publicly owned operating company and three privately-owned companies (Infracos) who will be contracted to maintain and enhance the existing network.

Working on the District line

The PPP contract was signed with Metronet Rail SSL to upgrade, renew and maintain the District line. Metronet Rail SSL's contract also covers the maintenance of the Metropolitan, Circle, Hammersmith & City and East London lines.

In order to ease transition to the new PPP structure, the operational side of the Underground has been reorganised from individual lines to a new structure reflecting the proposed Infraco groupings.

From September 1999, the District line has been grouped with the Metropolitan, Circle, Hammersmith & City and East London lines. From November 2003, Howard Collins will be responsible for delivering SSR train and station services to meet customers' requirements. The line's General Manager is Bob Thorogood.